First Presbyterian Church of Barnesville

CLIENT
First Presbyterian Church of Barnesville
LOCATION
Barnesville, Ohio
ARCHITECT
Derwacter and Associates
SQUARE FOOTAGE
3,579

The Barnesville Presbyterian Church Roof and Structural Repair project involved the removal of the existing roof to evaluate and repair/replace the existing structural steel and wood elements that were originally placed in 1901. The entire roof structure was in an advanced state of decay, and it supported the ornate, domed, plaster ceiling in the sanctuary. To provide the necessary access to the roof structure and maintain weather and water tightness throughout the renovation, we designed and fabricated temporary roof panels that were removed and replaced on a daily basis.