• news of note

    Wilbur Roby Joins the Robertson Team

    After forty-seven years in the construction industry, Wilbur continues his illustrious career with Robertson.  As a graduate of Lancaster High School in Lancaster, Ohio, and as carpenter by trade, ...

    More

    Robertson is Building a Planetarium

    In collaboration with The Works: Ohio Center for History, Art & Technology, The Ohio State University at Newark, and JBA Architects, Robertson will construct a $1.4 million SciDome ...

    More

    Samaneh &quote;Sam&quote; Nasrollahi Joins the Robertson Team

    As a recent graduate of Bowling Green State University with a Master of Science in Construction Management and a Bachelor of Arts in Architecture from IAU, Sam joins the Robertson Team as a Project ...

    More

    Robertson Breaks Ground at Denison University

    Robertson celebrated with Denison University at the ground breaking of the new Michael D. Eisner Center for the Performing Arts.  The festivities included reflective and motivational remarks from ...

    More

    Mike Grady Completes Field Leadership Excellence Series

    In March 2017, Mike Grady successfully completed the Field Leadership Excellence Series program offered through the Builders Exchange of Central Ohio.  The Field Leadership Series is an eight-session...

    More

    1 of page 7

  • projects

    The Michael D. Eisner Center for Performing Arts

      “The Michael D. Eisner Center for Performing Arts will be home to the departments of music, dance and theatre, creating a dynamic, interactive space where students can collaborate across disciplines.”Notices: Please do not park in front of the gates on College Street. We are >>

    More

    First Presbyterian Church

    The first Presbyterian Church of Granville project consisted of the renovation of the existing education building, an addition of a 2-story building with basement, and renovation of the existing 2-story church, including complete rebuild of the chancel.description 22,086 sf renovation 11,210 sf >>

    More

    AEP Building

    Robertson served as the design/build general contractor for this American Electric Power industrial truck storage facility. This LEED project included both electrical and HVAC automated systems.description 7,800 sf owner American Electric Powerarchitect Hasbrouk Engineering

    More

    THK
    THK

    Robertson served as general contractor for this state-of-the-art plant expansion in Hebron, Ohio. The scope of work included: Removal of existing loading dock area and development of new site.  Adding 60 ft clear span casting bays with new molten aluminum furnaces and nearly 1,000 feet of drainage>>

    More

    Tosoh (Cabot Corporation)

    This 90,000 square foot manufacturing and office facility was built for Cabot Thin Films, a large producer of Tantalum ingots for resale to specialized clients. This building features sloped truck docks, an entire skin made of precast concrete panels and access to major traffic corridors.description>>

    More

    More Projects

  • Building Maintenance

    Interested in Building Maintenance? or Need to Contact Us to Schedule Service?  >>